 1981  

De Veluwse Puin Recycling (VPR) is established to process construction and demolition waste from the region.

 

 1990

Takeover of operation of the regional dumpsite 'de Sluiner' from the Municipality of Voorst, on the basis of public-private participation. VAR started Dumping operations.

 

 1990

Installation commissioned for composting garden, fruit and vegetable waste (GFV waste).

 

1991

Purchase of the 'de Sluiner' site. Establishing of the construction centre. The construction centre (subsequently Engineering division) is responsible for coordinating all construction and development activities of the VAR divisions.

 

1994

Opening of the sorting plant. VAR starts sorting waste flows from private households and businesses.

 

1997

VAR pushes the boundaries. A composting installation developed by the Engineering division is commissioned in Arzamas, Russia.

 

1999

Start of remediation of the ‘former’ municipal dumpsite.

 

2000

VAR starts production of secondary fuels; energy from waste.

 

2000

VAR receives ISO 14001 certificate.

 

2001

VAR receives ISO 9001 certificate.

 

2003

Merger of the activities of the Sorting plant and production of Secondary fuels.

 

2003

VAR starts Wood recycling activities. Waste timber flows are processed into raw materials for the chipboard industry, and waste timber is converted into secondary fuel.

 

2004

VAR expands its activities to include the removal of dumpsites, wood processing and artificial grass recycling.

 

2004

VAR purchases a company in Spijk and launches the processing of high-calorific waste flows into secondary fuel for power stations.

 

2005

VAR receives the RHP inspection mark for Composting and for Soil remediation, VAR receives the BRL SIKB 7500 certificate.

 

2005

Commissioning of unique asbestos separator, jointly developed by VAR.

 

2005

Commissioning of mixing installation for Rubble recycling.

 

2006

Commissioning of mobile rubble crusher.

 

2008

Start of construction of GFV fermentation installation.

 

2009

Opening of GFV fermentation installation.

 

 