1981 | De Veluwse Puin Recycling (VPR) is established to process construction and demolition waste from the region.
|
1990 | Takeover of operation of the regional dumpsite 'de Sluiner' from the Municipality of Voorst, on the basis of public-private participation. VAR started Dumping operations.
|
1990 | Installation commissioned for composting garden, fruit and vegetable waste (GFV waste).
|
| 1991 | Purchase of the 'de Sluiner' site. Establishing of the construction centre. The construction centre (subsequently Engineering division) is responsible for coordinating all construction and development activities of the VAR divisions.
|
|---|---|
| 1994 | Opening of the sorting plant. VAR starts sorting waste flows from private households and businesses.
|
| 1997 | VAR pushes the boundaries. A composting installation developed by the Engineering division is commissioned in Arzamas, Russia.
|
| 1999 | Start of remediation of the ‘former’ municipal dumpsite.
|
| 2000 | VAR starts production of secondary fuels; energy from waste.
|
| 2000 | VAR receives ISO 14001 certificate.
|
| 2001 | VAR receives ISO 9001 certificate.
|
| 2003 | Merger of the activities of the Sorting plant and production of Secondary fuels.
|
| 2003 | VAR starts Wood recycling activities. Waste timber flows are processed into raw materials for the chipboard industry, and waste timber is converted into secondary fuel.
|
| 2004 | VAR expands its activities to include the removal of dumpsites, wood processing and artificial grass recycling.
|
| 2004 | VAR purchases a company in Spijk and launches the processing of high-calorific waste flows into secondary fuel for power stations.
|
| 2005 | VAR receives the RHP inspection mark for Composting and for Soil remediation, VAR receives the BRL SIKB 7500 certificate.
|
| 2005 | Commissioning of unique asbestos separator, jointly developed by VAR.
|
2005 | Commissioning of mixing installation for Rubble recycling.
|
| 2006 | Commissioning of mobile rubble crusher.
|
2008 | Start of construction of GFV fermentation installation.
|
| 2009 | Opening of GFV fermentation installation.
|